Glossary of the house plan, the 3D model and the construction quote
The 23 words you meet between a first sketch and a signed quote — each defined in plain language, then worked out on a real house. The examples all use the same model, the catalogue's 115 m² 3-bedroom house, so the figures add up from one page to the next.
Digital model
- BIM
- BIM (Building Information Modeling) is a method that describes a building as one digital model, in which every wall, door and room is an object that knows its dimensions and materials.
- Digital model
- A digital model is the three-dimensional representation of a building, made of real objects — walls, slabs, roof, openings — rather than plain lines.
- IFC
- IFC (Industry Foundation Classes) is an open, standardised file format (ISO 16739) used to exchange a digital building model between different programs.
Drawings
- Site plan
- A site plan shows the plot from above with the building placed on it: boundaries, the building's footprint, setbacks from neighbours and the road, access and services.
- Working drawings
- Working drawings are the detailed drawings the house is actually built from: every dimension, the thickness of each wall, the exact position of the openings, the foundations, the reinforcement and the services.
- Dimensioned plan
- A dimensioned plan is a plan with its measurements written on it: wall lengths, room sizes, the width and position of openings.
- Section
- A section is the drawing of a building sliced vertically, as if sawn from roof to foundations and looked at edge-on.
- Elevation
- An elevation is the drawing of one outside face of a building seen square-on, with no perspective.
Areas and levels
- Building footprint
- The building footprint is the area the building occupies on the land, measured to the outside of its walls, like the shadow it would cast at noon.
- Living area
- Living area is the sum of the floor areas of a home's rooms, measured inside the walls.
- G+1
- G+1 (written R+1 in French) means a building with a ground floor (G) and one floor above (+1).
Takeoff and quote
- Quantity takeoff
- A quantity takeoff is the list of the quantities of work in a building — so many m² of wall, m³ of concrete, metres of ring beam — measured from the drawings before work starts.
- Bill of quantities
- A bill of quantities (BoQ) is the document that lists every item of work with its quantity, unit and unit price, then multiplies one by the other.
- Cost estimate
- A cost estimate is an assessment of what a project will cost, made before work starts from the drawings and reference prices.
- Trade package
- A trade package is a part of the works given to one trade: masonry, roofing, plumbing, electrics, painting.
- Contingency
- Contingency covers the unforeseen costs of a build: worse ground than expected, a rise in a material price, work that must be redone, bad weather.
The works
- Structural works
- Structural works are everything that makes the building stand and keeps the weather out: earthworks, foundations, load-bearing walls, columns, slabs, roof structure and covering.
- Finishing works
- Finishing works are all the work that makes an already watertight house liveable: joinery, plumbing, electrics, floors, ceilings, internal render, paint.
- Plinth wall
- The plinth wall is the low part of the walls, between the foundations and the ground floor.
- Ring beam
- A ring beam is a band of reinforced concrete that ties the walls together so they act as one.
- Slab
- A slab is a horizontal plate of concrete that forms a floor.
- Roof structure
- The roof structure is the frame that carries the roof: trusses, purlins and rafters, in timber or steel, assembled to give the roof its pitch and take its weight down to the walls.
Procedures
- Building permit
- A building permit is the official authorisation required before building.
Why every definition comes with a number
A definition tells you what a word means; it does not tell you what to expect on your own site. "A ring beam is a band of reinforced concrete" is true and useless until you know that on a 115 m² house it is 43,2 lm going right round the building. Each page here gives both, with quantities computed by the SangoImmo engine on a model you can open, edit and price with your own local prices.
Frequently asked questions
- What is the difference between a takeoff, a bill of quantities and a quote?
- The takeoff lists quantities with no prices. The bill of quantities applies a unit price to each quantity. The quote is the contractor's price offer, usually built on that bill, and it is binding once signed.
- What is BIM and do I need it for a single house?
- BIM describes a building as one digital model from which the plan, the 3D view, the takeoff and the quote are produced. For a house it mainly keeps the quote right when the plan changes.
Sources and references
- Quantities and areas: computed by the SangoImmo engine from the model itself — see the methodology. Drawings and figures are reusable under CC BY 4.0.
- Prices: none are published here. What a house costs depends on where it is built; in the app you enter the prices, taxes and rules of your own region.
- Building rules differ from one place to another: check a plan with the competent authority where you build before you start.
See these words on your own house
Draw your plan: the 3D view, the takeoff and the quote are computed from the same model, at your own prices.
Launch SangoImmo — freeor try the quantity calculators